O'Connor, James ThomasGibson, G. Edward (George Edward), 1958-1752476552008-08-282017-05-112008-08-282017-05-112007http://hdl.handle.net/2152/3370For organizations such as state departments of transportation, other public agencies, or private companies, adopting a new approach to procure services for delivery of construction projects requires significant organizational changes; modifications to both their work processes and existing organizational structures may be needed. These adjustments, encompassing many different aspects of the organization's interests, must occur for the change initiative to be successfully put into practice. In this research, the adoption of integrated project delivery methods within the transportation project sector is investigated to better understand the dynamics of this change. In the context of this study, an Owner's project delivery strategy is defined as the set of project delivery methods that are adopted for delivering capital projects. This dissertation presents findings from a study of Public Owner organizations that have implemented the designbuild method for delivering highway projects. Using as a case study the new $1.3 billion SH-130 tolled expressway project in Central Texas, the author analyzed project documentation and conducted many interviews with individuals affiliated with owner, legal, engineering consultants, and contractors. Findings suggest that project representatives institutionalize practices and routines connected to the new approach by adapting to new challenges, rather than "overwriting" previously existing practices. Similarly, the institutionalization of innovative approaches to project delivery happens concurrently with a deinstitutionalization of the previous approaches. Building upon these findings, a conceptual framework is presented for helping Owner organizations implement change in their project delivery strategy. The proposed conceptual framework is based upon both existing published literature and interviews with managers involved in implementing a strategic change in project delivery strategy. This framework was further refined by making a comparative study of four transportation projects in the United States. In addition, a detailed implementation framework was validated and further developed through a Delphi study with representatives from several organizations whose major responsibilities and experiences include the management of change in procurement approach. Findings from these studies, including application to the construction industry and other industries are presented.electronicengCopyright © is held by the author. Presentation of this material on the Libraries' web site by University Libraries, The University of Texas at Austin was made possible under a limited license grant from the author who has retained all copyrights in the works.Project managementRoads--Texas--Design and construction--Planning--Case studiesRoads--Texas--Design and construction--Management--Case studiesRoads--Design and construction--PlanningRoads--Design and construction--ManagementProduction schedulingEngineering--ManagementPlanning for strategic change in the project delivery strategyThesis