Managerial perceptions of operational flexibility
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Large complex construction projects such as building an interstate highway, a dam, a chemical plant, an off-shore oil rig and a waste-to-energy plant often include unpredictable geological conditions, labor supplies, material deliveries, and weather that cause uncertainty. Effective and efficient acquisition and construction require the proactive management of these and other uncertainties to meet performance, schedule, and cost targets. Flexibility in the form of real options can be an effective tool for managing uncertainty and thereby adding value to construction projects. But flexibility can be expensive to obtain, maintain, and implement. Real options theory suggests a general approach and has developed precise valuation models. But these models of simplified real options (compared to managerial practice) have failed to significantly improve practice, partially because of a lack of knowledge of real options use by practicing managers. In contrast, the majority of managerial real options applications are identified, designed, valued, and implemented tacitly by construction managers. Understanding current practice and its similarities and differences with theory is critical for developing operational real options theories that can improve construction practice. Few descriptions of managerial real options practice exist as a basis for improvement. To address this need the current research has experiment subjects manage a simple but uncertain installation project with managerial flexibility. Subjects repeatedly value an option to avoid a slow and expensive system integration failure. Real options theory is used to explain their behaviors by customizing the model of uncertainty to reflect themanagement context. To further analyze managerial real options practice, a system dynamics simulation model of the experimental installation project is developed. Policies for using flexibility to manage uncertainty that are applied by subjects are modeled and performances are simulated across a range of uncertain conditions to evaluate and compare policy effectiveness. All 21 subjects that participated in the research perceived flexibility as an effective tool in managing uncertain projects. But they are not aware of the factors that impact flexibility value. They correctly identified the relationship of some factors with flexibility value but not all of them and not the magnitude of impaction. Further research and development needs for expanding real options theory into the operational management of construction are discussed based on experiment and simulation results.