Home
    • Login
    View Item 
    •   TDL DSpace Home
    • Federated Electronic Theses and Dissertations
    • University of Texas at Austin
    • View Item
    •   TDL DSpace Home
    • Federated Electronic Theses and Dissertations
    • University of Texas at Austin
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Assessing reservoir performance and modeling risk using real options

    Thumbnail
    Date
    2012-05
    Author
    Singh, Harpreet
    Metadata
    Show full item record
    Abstract
    Reservoir economic performance is based upon future cash flows which can be generated from a reservoir. Future cash flows are a function of hydrocarbon volumetric flow rates which a reservoir can produce, and the market conditions. Both of these functions of future cash flows are associated with uncertainties. There is uncertainty associated in estimates of future hydrocarbon flow rates due to uncertainty in geological model, limited availability and type of data, and the complexities involved in the reservoir modeling process. The second source of uncertainty associated with future cash flows come from changing oil prices, rate of return etc., which are all functions of market dynamics. Robust integration of these two sources of uncertainty, i.e. future hydrocarbon flow rates and market dynamics, in a model to predict cash flows from a reservoir is an essential part of risk assessment, but a difficult task. Current practices to assess a reservoir’s economic performance by using Deterministic Cash Flow (DCF) methods have been unsuccessful in their predictions because of lack in parametric capability to robustly and completely incorporate these both types of uncertainties. This thesis presents a procedure which accounts for uncertainty in hydrocarbon production forecasts due to incomplete geologic information, and a novel real options methodology to assess the project economics for upstream petroleum industry. The modeling approach entails determining future hydrocarbon production rates due to incomplete geologic information with and without secondary information. The price of hydrocarbons is modeled separately, and the costs to produce them are determined based on market dynamics. A real options methodology is used to assess the effective cash flows from the reservoir, and hence, to determine the project economics. This methodology associates realistic probabilities, which are quantified using the method’s parameters, with benefits and costs. The results from this methodology are compared against the results from DCF methodology to examine if the real options methodology can identify some hidden potential of a reservoir’s performance which DCF might not be able to uncover. This methodology is then applied to various case studies and strategies for planning and decision making.
    URI
    http://hdl.handle.net/2152/ETD-UT-2012-05-5149
    Collections
    • University of Texas at Austin

    Related items

    Showing items related by title, author, creator and subject.

    • Modeling and motor performance: an examination of model similarity and model types on children's motor performance 

      Griffin, L. Kent (Texas Tech University, 1999-05)
      Based on Bandura's social learning theory (1977), social cognitive theory (1986) and Yando et al. (1978) this study will examine the effect of model similarity (i.e., gender) and the effect of model type (i.e., learning/skilled) ...
    • A joint multiple discrete continuous extreme value (MDCEV) model and multinomial logit model (MNL) for examining vehicle type/vintage, make/model and usage decisions of the household 

      Sen, Sudeshna (2006)
    • A Study of Building Information Modeling Usage through the Perceived Utilization of Facilities Management Training, Building Information Modeling Technical Specifications, and a Quality Building Information Model for Facilities Management at Higher Educational Institutions in Texas 

      Thompson, Darrell (2014-12-15)
      The research for this study investigated the correlation between the perceived usage of Building Information Modeling in Facilities Management and; the perceived training level of the FM personnel, the perceived specification ...

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    TDL
    Theme by @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    TDL
    Theme by @mire NV